McDonald's ANZ - Warranty Guidelines
CARPIGIANI
APPROVED LABOUR SCHEDULE FOR ALL CARPIGIANI WARRANTY REPAIRS
GUIDELINE: AVERAGE TIME REQUIRED TO PERFORM TECHNICAL INTERVENTIONS ON CARPIGIANI MODELS OPERATION/DESCRIPTION HOURS 1. FIRST INSTALLATION: UN-CRATING, HOOK-UP, WASHING, START-UP AND TRAINING 5.0 2. ADJUSTMENT OF MACHINE FUNCTIONS 0.5 3. SYRUP CALIBRATION 0.15 4. SUNDAE SIDE STRIPPING, WASHING, SANITIZING, REASSEMBLING 1.0 5. SHAKE SIDE STRIPPING, WASHING, SANITIZING, REASSEMBLING 1.5 6. SEARCH FOR REFRIGERANT LEAKS AND RECHARGE 1.0-3.0 THE FOLLOWING IS A LIST OF REPLACEMENTS (DISASSEMBLY OF PARTS, REASSEMBLY AND CHECK-OUT) 7. MIX PUMP MOTOR 1.0 8. MIX AGITATOR SHAFT ASSEMBLY 1.0 9. MIX AGITATOR BELT 0,5 10. GEAR BOX AND MOTOR 2.0 11. COMPRESSOR (A) MECHANICAL PROBLEM-HEAD REPLACEMENT 2.0 12. COMPRESSOR (B) REPLACEMENT PLUS FILTER 2.5 13. MIX AGITATOR MOTOR-DIAGNOSIS AND REPLACEMENT 1.0 14. ELECTRONIC BOARD-DIAGNOSIS AND REPLACEMENT 1.0 15. CONTROL PANEL REPLACEMENT 1.0 16. ELECTRICAL COMPONENT OF ELECTRIC BOX 0.5 17. FAN MOTOR 1.0 18. SYRUP PERISTALTIC PUMP MOTOR 1.0 19. SHAKE DISPENSING PISTON ACTUATOR 1.0 20. SHAKE SPINNER MOTOR 1.0 21. SHAKE LEVEL SENSOR 0.5 22. SUNDAE SIDE PROXIMITY SENSOR 0.5 23. REFRIGERATOR PRESSURE SWITCH 0.5 24. CONDENSER CLEANING 1.0 25. THERMOSTATIC VALVE 2.0 26. REFRIGERATING VALVE BODY 2.0 27. TEMPERATURE PROBE 0.5 28. DRY REED PROBE 0.5 29. SYRUP BLOCK O-RINGS ON FRONT PANEL 1.0 30. SYRUP HOSE 0.5 31. BEATER BELT REPLACEMENT 0.5
Page 21 of 82
Version 1.2 Issued 23 December 2024
Once Printed or saved, this document is considered an uncontrolled version. For the current version, refer to Warranty Guidelines online here
Made with FlippingBook - professional solution for displaying marketing and sales documents online